Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Seafox 5 Heads for Vilssingen after Delivery
Shipbuilding

September 28, 2012 · about 14 years ago

Seafox 5 Heads for Vilssingen after Delivery

The self-propelled DP2 jack-up Seafox 5 is close to delivery in Singapore for subsequent dry-tow to the North Sea. Following the naming ceremony at Keppel FELS shipyard on 18 August 2012, the multi-purpose support vessel is currently carrying out sea trials and is expected in the North Sea early Nov

2 minutes read
  • LinkedIn
  • X
  • Email

The self-propelled DP2 jack-up Seafox 5 is close to delivery in Singapore for subsequent dry-tow to the North Sea. Following the naming ceremony at Keppel FELS shipyard on 18 August 2012, the multi-purpose support vessel is currently carrying out sea trials and is expected in the North Sea early November.

This new KFELS design is an innovative concept for a variety of offshore applications and based on the result of a combined market knowledge and technology expertise, and incorporates 20 years of Workfox jack-up operational experience. The Seafox 5 can be used for the heaviest foundation and turbine installations in the offshore wind market, as well as for installation of field development platforms and decommissioning activities (platform and jacket removals) in the Southern North Sea, Danish Sector and large parts of the Central North Sea up to depths of 65-70m for clients in the offshore wind and oil & gas industry.

The self-propelled DP2 jack-up is equipped with a heavy-lift pedestal crane capable of hoisting 1,200 metric tons, a free deck area of more than 3,500 m2, a variable load of 7,000 metric tons and a jacking system for quick and frequent usage. The enhanced jacking and moving criteria (Hs 2.0m by 6-8/sec period) of the Seafox 5 will provide operators substantial added value, as well as the impressive survival criteria (Hmax 20m by associated period of 14.6 sec in 65 m water depth and current of 2 knots).

Upon arrival the Seafox 5 will be mobilised in Vlissingen for her first assignment. The jack-up has been chartered to Aarsleff & Bilfinger Berger Joint Venture (ABJV) to install offshore wind foundations in the 288 megawatt (MW) Dan Tysk wind farm in the German Sector of the North Sea.

[mappress]

Source: Workfox BV, September 28, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free