Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Loading of South Pars Phase 12 Platform Begins (Iran)
Fossil Energy

October 2, 2012 · about 14 years ago

Loading of South Pars Phase 12 Platform Begins (Iran)

Loading operations of the first platform of South Pars gas field phase 12 started today in Khoramshahr, Iran. Managing director of Iranian Offshore Engineering and Construction Company (IOEC), Ali Taheri told Shana the platform with 3.26 thousand tons of weight and 4.410 square meters area will be i

2 minutes read
  • LinkedIn
  • X
  • Email

Loading operations of the first platform of South Pars gas field phase 12 started today in Khoramshahr, Iran.

Managing director of Iranian Offshore Engineering and Construction Company (IOEC), Ali Taheri told Shana the platform with 3.26 thousand tons of weight and 4.410 square meters area will be installed in about next 30 days in South Pars gas field phase 12 in Persian Gulf waters.

IOEC’s managing director further said accessories of the platform include a tripod jacket, two bridges, a middle deck, and a flare and its platform each weighing respectively 1700, 369, 106 and 185 tons.

Taheri pointed out that development of SP’s phase 12 requires three main platforms and one satellite platform adding IOEC is in charge of construction and installation of the main platforms.

South Pars phase 12 platform will be loaded to a barge in next two weeks and will be transferred to related site for installation, according to the official.

Construction of second and third platforms of the phase 12 is under way in Khoramshahr Yard and they will be ready for transferring and installation at the location soon after the installation of the first unit.

South Pars gas field phase 12 will yield about one billion cubic meters of gas per day, which is equal to gas production from three normal phases of South Pars gas field. Two third of the produced gas is going to be converted to LNG and the remaining one third will be injected to national gas grid.

[mappress] Source , October 2, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free