Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Eni Tests Blow-Out Preventers at Heron (Australia)
Business & Finance

October 3, 2012 · about 14 years ago

Eni Tests Blow-Out Preventers at Heron (Australia)

MEO Australia Limited advises that at 06:00 Darwin time on Tuesday 2nd October, Eni Australia Ltd (Eni) as operator of the NT/P68 exploration permit had drilled the 311mm (12 ¼”) hole from 3,740m to 3,828mMDRT (metres Measured Depth below Rotary Table), run logs, installed and cemented 244mm (9 5/8”

1 minutes read
  • LinkedIn
  • X
  • Email

MEO Australia Limited advises that at 06:00 Darwin time on Tuesday 2nd October, Eni Australia Ltd (Eni) as operator of the NT/P68 exploration permit had drilled the 311mm (12 ¼”) hole from 3,740m to 3,828mMDRT (metres Measured Depth below Rotary Table), run logs, installed and cemented 244mm (9 5/8”) casing to 3,818mMDRT.

There have been no reportable incidents. The forward plan is to test the blow-out preventers prior to drilling ahead in 216mm (8 ½”) hole to Total Depth (TD) at 4,265mMDRT or the gas water contact. At TD a full formation evaluation program will be run including formation pressures and fluid sampling. If warranted, a production test will be run to determine reservoir productivity.

The well was spudded on August 24th 2012 and will be drilled to at least 4,265mMDRT or the gas water contact. The key objectives of the well are to determine the productivity of the Elang-Plover reservoir and the gas composition. The drilling program is expected to take around 60 days.

[mappress] Press Release, October 03, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

22 days ago

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

22 days ago
FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago