Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›MEO Reports Gas Shows at Heron South-1 (Australia)
Fossil Energy

October 8, 2012 · about 14 years ago

MEO Reports Gas Shows at Heron South-1 (Australia)

MEO Australia Limited advises that at 0600 Darwin time on Monday 8th October, Eni Australia Ltd (Eni) as operator of the NT/P68 exploration permit had drilled the 216mm (8 ½”) hole to 4,068.5mMDRT (metres Measured Depth below Rotary Table) and was preparing to cut core from 4,068.5m to 4,105mMDRT. T

1 minutes read
  • LinkedIn
  • X
  • Email

MEO Australia Limited advises that at 0600 Darwin time on Monday 8th October, Eni Australia Ltd (Eni) as operator of the NT/P68 exploration permit had drilled the 216mm (8 ½”) hole to 4,068.5mMDRT (metres Measured Depth below Rotary Table) and was preparing to cut core from 4,068.5m to 4,105mMDRT. There have been no reportable incidents.

Reservoir quality sands exhibiting gas shows were encountered below 4,059mMDRT. The core will provide a physical sample of the reservoir rock to allow reservoir properties to be measured and to provide a calibration for the well logs.

The forward plan is to complete the current coring operation and resume drilling in 216mm (8 ½”) hole to Total Depth (TD) at 4,265mMDRT or the gas water contact. At TD a full formation evaluation program will be run including formation pressures and fluid sampling. If warranted, a production test will be run to determine reservoir productivity.

Heron South-1 – spudded on 24th of August 2012 using the ENSCO-109 jack-up drilling rig and is expected to take up to 60 days to complete. Eni has 60 days following the conclusion of Heron South-1 drilling to elect whether to fund a second Heron well to fully earn its 50% interest in the Heron area of the permit or withdraw from the Heron area in which case the participating interest reverts to MEO.

[mappress] Press Release, October 8, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free