Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›MMA’s Vessel Supports Santos’ FPSO in Australia
Fossil Energy

October 16, 2012 · about 14 years ago

MMA’s Vessel Supports Santos’ FPSO in Australia

Mermaid Marine Australia Limited (MMA) has been awarded a contract with Santos Limited in respect of the “Mermaid Ranger” for the provision of offshore marine support to Santos’ Modec Venture 11 (MV 11) floating production, storage and offloading (FPSO) facility in the Carnarvon Basin. The contract

2 minutes read
  • LinkedIn
  • X
  • Email

Mermaid Marine Australia Limited (MMA) has been awarded a contract with Santos Limited in respect of the “Mermaid Ranger” for the provision of offshore marine support to Santos’ Modec Venture 11 (MV 11) floating production, storage and offloading (FPSO) facility in the Carnarvon Basin.

The contract is for a term of two (2) years firm with three (3) x 12 month options and is due to commence in March 2013. The “Mermaid Ranger” is a 40 metre OSV built in 2007 and purchased by MMA in 2010.

The contract value is approximately A$15 million for the firm period with further upside should the options be exercised.

The MV 11 FPSO services the Mutineer-Exeter fields and will also service the Fletcher Finucane fields once developed. The Finucane South-1A discovery underpinning the Fletcher Finucane project was made in May 2011 and is located approximately seven kilometres to the South of the Fletcher oil field and 16 kilometres East of the MV 11 FPSO at Mutineer-Exeter.

The project involves the development of a three-well sub-sea tie back to MV 11 FPSO. The project is expected to extend the economic life of Mutineer-Exeter by up to four years, with an estimated average gross production rate of 15,000 barrels per day for the initial 12 months. Gross proved and probable reserves are estimated at approximately 14 million barrels.

The $490 million Fletcher Finucane project was sanctioned by the Joint Venture Partners on 13 January 2012, with development drilling commencing in June 2013, and first oil is expected in the second half of 2013.

[mappress] Press Release, October 16, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free