Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Dragados Offshore Secures Contract from Pemex in Gulf of Mexico
Business & Finance

October 22, 2012 · about 13 years ago

Dragados Offshore Secures Contract from Pemex in Gulf of Mexico

Pemex Exploration and Production has awarded Dragados Offshore with the contract for the project “Compresión Alta Litoral A” (CA-LITORAL-A), to be installed in the Campeche region of the Gulf of Mexico. The scope of work of the contract includes Engineering, Procurement, Construction, Load-out, Seaf

2 minutes read
  • LinkedIn
  • X
  • Email

Pemex Exploration and Production has awarded Dragados Offshore with the contract for the project “Compresión Alta Litoral A” (CA-LITORAL-A), to be installed in the Campeche region of the Gulf of Mexico.

The scope of work of the contract includes Engineering, Procurement, Construction, Load-out, Seafastening, Transport, Installation, Testing and Start-up of the platform, with a total weight of more than 15.000 tons, including the 9.000 ton main deck, 1.850 ton jacket, and bridges and substructures.

The platform, which has as main objective the increase of current oil and gas production, will be designed to cope with the required flexibility to comply with the new operating conditions of the Litoral Processing centre, to eliminate excess gas flaring, and to cover modular capacity as a function of the impact of increasing production. The compression system will have the capacity to increase pressure to 85 kg/cm2 by means of high pressure compression modules, and will be prepared and ready for the second phase, when the Litoral Process Centre (CP-Litoral-A) starts production, with an overall processing capacity of 200 Mbd of crude oil and 600 MMpcsd of gas.

The Project will start immediately, and will have an approximate duration of two and a half years, including the offshore hook-up, commissioning and start-up phase offshore. The project will be executed in its entirety from Dragados Offshore’s facilities in Mexico.

The deck will be installed by means of a “Float over” operation, which will be the first time that this method is used in Mexico, while the rest of the structures will be installed by traditional “single-lift”.

With this new contract, Dragados Offshore maintains its leadership in the design, fabrication, commissioning and start-up of offshore oil and gas platforms in the Gulf of Mexico.

[mappress] Press Release, October 22, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago