Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Final Operation of Boreas-1 Production Testing Program Performed (Australia)
Fossil Energy

October 24, 2012 · about 14 years ago

Final Operation of Boreas-1 Production Testing Program Performed (Australia)

A production logging run is being performed as the final operation of the production testing program at Karoon Gas Australia Ltd’s Boreas-1 exploration well. Upon completion of this final operation, the testing string will be removed from the well. During flow testing this week, Boreas 1 exploration

2 minutes read
  • LinkedIn
  • X
  • Email

A production logging run is being performed as the final operation of the production testing program at Karoon Gas Australia Ltd’s Boreas-1 exploration well. Upon completion of this final operation, the testing string will be removed from the well.

During flow testing this week, Boreas 1 exploration well flowed gas to the surface at an equipment constrained maximum sustained rate of up to 30 MMscf/d through a 40/64 inch choke at a well head pressure of 3300 psi.

A Condensate-Gas Ratio of 18 bbl/MMscf was measured at the surface, along with a 16% CO2 content taken from the gas flow on a volume basis. This condensate/gas ratio is almost double the rate discovered in the Kronos 1 well.

The flow rates were achieved from a multi-rate flow test followed by pressure build up and bottom hole reservoir fluid sampling in a perforated interval of 70 metres between 4904 and 4974 metres in the primary target Plover formation.

Based on an analysis of the well test data, Karoon believes that future production wells drilled adjacent to the Boreas-1 location have the potential to flow at commercial rates in excess of 100 MMscf/d.

The Transocean Legend semi-submersible rig is drilling and testing the Boreas-1 well.

ConocoPhillips is the operator of the jointly held WA-314-P, WA-315-P and WA-398-P Browse Basin permits containing the previously announced Poseidon and Kronos gas discoveries. Karoon Gas Australia Ltd holds 40% of the permit WA-315-P and WA-398-P, and 90% of permit WA-314-P.

Boreas-1 is located approximately 4 kilometres south of Poseidon-1 in WA-315-P on a large tilted fault block which is part of the of the north-east trending structural high of the greater Poseidon structure. The objective of the well is to test the extent, presence and quality of reservoirs within the Boreas-1 fault block.

[mappress] Press Release, October 24, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & FinanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free