Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Denmark: Knud E. Hansen Designs Two Wind Turbine Installation Vessels for Swire
Offshore Wind

October 25, 2012 · about 14 years ago

Denmark: Knud E. Hansen Designs Two Wind Turbine Installation Vessels for Swire

The self-elevating and self-propelled vessels were designed for Swire Blue Ocean, Denmark, for installation of offshore wind turbines and support in the offshore oil & gas sector. The first of the two vessels was delivered from Samsung Geoje Shipyard in October 2012, and the second is expected to fo

2 minutes read
  • LinkedIn
  • X
  • Email

The self-elevating and self-propelled vessels were designed for Swire Blue Ocean, Denmark, for installation of offshore wind turbines and support in the offshore oil & gas sector.

The first of the two vessels was delivered from Samsung Geoje Shipyard in October 2012, and the second is expected to follow in the winter of 2013.

The vessels are equipped with six 105 m long truss-type legs and a high-speed rack-and-pinion jacking system, which enables them to jack to a safe height of 17 m above the water on 60 m water depth.

The legs can, however, be lengthened by 20 m, in which case the vessels can jack to 22 m on 75 m water depth, where they can survive even the most severe storm conditions.

The 1200 t leg-mounted crane is capable of installing 500 t heavy nacelles on top of turbine towers 120 m above the sea, and the 4300 m 2 cargo deck has space for up to twelve 3.6 MW turbines.

The relatively fine hull lines in the bow gives the vessels a good speed even in higher waves, and with 4 stern thrusters, 2 bow thrusters, 2 drop-down thrusters and a DP-2 dynamic positioning system the vessels have state of the art maneuverability.

The accommodation holds 111 crew single cabins with private bathrooms as well as all necessary crew facilities and offices, and a helideck is fitted forward above the accommodation block.

[mappress]

Press release, October 25, 2012; Image: Knud E. Hansen

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free