Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Wind Turbine Installation Vessel Pacific Orca Arrives in Denmark
Shipbuilding

October 26, 2012 · about 14 years ago

Wind Turbine Installation Vessel Pacific Orca Arrives in Denmark

The self-elevating and self-propelled vessels were designed for Swire Blue Ocean, Denmark, for installation of offshore wind turbines and support in the offshore oil & gas sector. The first of the two vessels was delivered from Samsung Geoje Shipyard in October 2012, and the second is expected to fo

2 minutes read
  • LinkedIn
  • X
  • Email

The self-elevating and self-propelled vessels were designed for Swire Blue Ocean, Denmark, for installation of offshore wind turbines and support in the offshore oil & gas sector.

The first of the two vessels was delivered from Samsung Geoje Shipyard in October 2012, and the second is expected to follow in the winter of 2013.

The vessels are equipped with six 105 m long truss-type legs and a high-speed rack-and-pinion jacking system, which enables them to jack to a safe height of 17 m above the water on 60 m water depth.

The legs can, however, be lengthened by 20 m, in which case the vessels can jack to 22 m on 75 m water depth, where they can survive even the most severe storm conditions.

The 1200 t leg-mounted crane is capable of installing 500 t heavy nacelles on top of turbine towers 120 m above the sea, and the 4300 m2 cargo deck has space for up to twelve 3.6 MW turbines.

The relatively fine hull lines in the bow gives the vessels a good speed even in higher waves, and with 4 stern thrusters, 2 bow thrusters, 2 drop-down thrusters and a DP-2 dynamic positioning system the vessels have state of the art maneuverability.

The accommodation holds 111 crew single cabins with private bathrooms as well as all necessary crew facilities and offices, and a helideck is fitted forward above the accommodation block.

[mappress]

KnudEHansen, October 26, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free