Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›USA: Bath Iron Works Seeks Corps Permit for Dredging
Dredging

October 30, 2012 · about 14 years ago

USA: Bath Iron Works Seeks Corps Permit for Dredging

Bath Iron Works Corporation is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the United States in conjunction with testing ships and maintenance dredging in Bath, Maine. Bath Iron Works Corporation proposes to place gravel and stone fill ma

2 minutes read
  • LinkedIn
  • X
  • Email

Bath Iron Works Corporation is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the United States in conjunction with testing ships and maintenance dredging in Bath, Maine.

Bath Iron Works Corporation proposes to place gravel and stone fill material below the high tide line of the Kennebec River in Bath to cover approximately 7,020 square feet of river bottom adjacent to one of the applicant’s ship berths to provide approximately 3.5 feet of scour protection during required testing of ship electrical systems (for both generating and propulsion). This propulsion testing program is known as the Brake Wheel Project and is designed to test ship power but with no thrust while a ship is dockside.

Concurrently, Bath Iron Works proposes to conduct maintenance dredging at several locations at their facility. Corps permit No. NAE-2007-02528 authorized similar dredging and contained Special Conditions allowing continued maintenance dredging upon notification to the Corps. Approximately 70,000 cubic yards of primarily sand will be dredged by mechanical means from a 12.6-acre area to a depth of -70 feet mean low water (mlw) to re-establish operational depths within their drydock sinking basin.

This material will be disposed of at an in-river disposal site located downriver off of Bluff Head. Approximately 3,500 cubic yards of sand and silt will be dredged by mechanical means from an 8-acre area to a depth of -14 feet mllw to restore operational depths within their drydock landing grid. This material will be disposed of at an upland, non-wetland location.

[mappress]

Press Release, October 30, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free