Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Miller Energy Completes Work-Over on Cook Inlet Well, Alaska
Fossil Energy

October 31, 2012 · about 14 years ago

Miller Energy Completes Work-Over on Cook Inlet Well, Alaska

Miller Energy Resources has successfully completed a work-over on the RU-1 crude oil well with newly commissioned Rig 35 on the Osprey platform in Alaska’s Cook Inlet. The work-over consisted of removing two failed electric submersible pumps (“ESP”) and several restrictive flow devices, followed by

2 minutes read
  • LinkedIn
  • X
  • Email

Miller Energy Resources has successfully completed a work-over on the RU-1 crude oil well with newly commissioned Rig 35 on the Osprey platform in Alaska’s Cook Inlet.

The work-over consisted of removing two failed electric submersible pumps (“ESP”) and several restrictive flow devices, followed by installing a new ESP. The RU-1 well has demonstrated an initial production of 482 barrels of oil per day (“BOD”), which exceeds the previous average flow rate under its previous operator from September 2007 through July 2009 of 125 BOD. This was the first project for Miller’s new Rig 35, which received state approval to operate in August.

Rig 35, a National 1320, 2000 hp rig, is designed for offshore and onshore drilling to a maximum drilling depth of 24,000 feet. Cook Inlet Energy, a wholly owned subsidiary of Miller led by David Hall, will deploy Rig 35 to redevelop RU-3, a previously producing gas well to address Alaska’s continuing gas shortage. Following these two wells, Miller will then target the RU-2, RU-4, and RU-5 wells for work-over. Through the use of advanced drill techniques and wellbore optimization, Miller expects production rates to meet or exceed historical flow rates as demonstrated on the RU-1 and RU-7 work-overs.

“The successful redevelopment of RU-1 is another significant milestone for Miller. Our fixed costs to operate the Osprey platform are covered by existing production, so each additional barrel of oil produced comes at an estimated marginal incremental cost of less than $5 per barrel. This means that each well brought online on the platform has a significant direct, positive impact on Miller’s bottom line,” said Scott M. Boruff, Miller’s CEO . “With Rig 35 working to restore production from the Redoubt Shoals Field, we expect to see major increases in our production over the next few months which will build significant long term value for our shareholders.”

[mappress] Press Release, October 31, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free