Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Brazil: Final Touches on FPSO Cidade de São Paulo Completed
Shipbuilding

November 15, 2012 · about 14 years ago

Brazil: Final Touches on FPSO Cidade de São Paulo Completed

Petrobras, alongside its partners BG Group and Repsol Sinopec Brasil, and by means of its affiliate Guará-BV, announced that the construction work for FPSO Cidade de São Paulo was completed on November 11. The vessel has left the Brasfels shipyard, in Angra dos Reis and is currently undergoing final

2 minutes read
  • LinkedIn
  • X
  • Email

Petrobras, alongside its partners BG Group and Repsol Sinopec Brasil, and by means of its affiliate Guará-BV, announced that the construction work for FPSO Cidade de São Paulo was completed on November 11.

The vessel has left the Brasfels shipyard, in Angra dos Reis and is currently undergoing final testing in sheltered waters. It is expected to set sail to its definitive site within the next few days.

FPSO Cidade de São Paulo’s hull was converted at the Cosco shipyard, in China. Module installation, assembly, and integration work got underway in early 2012, and was done entirely at Brasfels, in Angra dos Reis.

The unit will be deployed in the Sapinhoá field, in the Santos Basin pre-salt cluster, at a water depth of approximately 2,200 meters. FPSO Cidade de São Paulo’s first oil is expected for January 2013, when it will be interconnected to the first well. The remaining wells, for a total of six production wells and five injector ones, will then be interconnected. Capable of producing 120,000 barrels of oil and 5 million m3 of gas per day, this platform will be the first definitive production unit to operate in the Sapinhoá field, whose development project calls for yet another production unit, to come on stream in the second half of 2014. The second production unit, FPSO Cidade de Ilhabela, has already been hired by the Consortium and is currently being converted.

The consortium for Block BM-S-9 is operated by Petrobras (45%), in partnership with BG E&P Brasil Ltda. (30%), and Repsol Sinopec Brasil S.A. (25%).

[mappress]

Petrobras, November 15, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free