Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›STX Finland Holds Naming Ceremony for Double-Ended Ferry
Shipbuilding

November 26, 2012 · about 14 years ago

STX Finland Holds Naming Ceremony for Double-Ended Ferry

On Friday 23 November 2012, STX Finland Oy’s Rauma Shipyard celebrated the naming of the double-ended ferry built for and delivered to Suomen Lauttaliikenne Oy (Finferries). The godmother of the next generation road ferry, professor Elina Pirjatanniemi, gave the ship name “Stella” with the invited g

2 minutes read
  • LinkedIn
  • X
  • Email

On Friday 23 November 2012, STX Finland Oy’s Rauma Shipyard celebrated the naming of the double-ended ferry built for and delivered to Suomen Lauttaliikenne Oy (Finferries).

The godmother of the next generation road ferry, professor Elina Pirjatanniemi, gave the ship name “Stella” with the invited guests, the representatives of Suomen Lauttaliikenne, STX Finland, and the classification society Bureau Veritas, as well as the members of the media witnessing the ceremony.

The environmentally friendly double-ended ferry, NB 1380, entered production in December 2011 at the STX Finland’s Rauma Shipyard. The vessel will operate in Turku archipelago, Finland, on the Korppoo – Houtskari route, the length and challenging ice conditions of which will set special requirements on the vessel’s performance. Particular attention has been paid to the ferry’s energy efficiency and safety. The 65 meter long ferry is double-ended, in other words, capable of running in both directions, and accommodates some 250 passengers, three tandem trailers and 39 cars. The new feature offered for the passengers is the modern indoor café. Stella will enter traffic at the beginning of 2013. The delivery included also three floating link spans, facilitating rapid loading of the ferry.

“The design, procurement and building processes at the STX Finland’s Rauma Shipyard have proceeded according to plans, and the co-operation with the customer, authorities and co-operation partners has gone very smoothly. We are very satisfied to be able to deliver this ferry, representing the cutting edge of shipbuilding in this vessel type, to Finferries and the residents of the Turku archipelago,” says Toivo Ilvonen, Director of STX Finland’s Rauma Shipyard .

“Stella will make the everyday life of those in need of moving around in the archipelago easier for several decades to come. This modern road ferry has been designed taking account of the needs of both the passengers and the environment. Built with Finnish professional competence, this ferry is a concrete example of the fact that heavy investments must be made in maintaining the viability of archipelago areas, today and in the future,” says Mats Rosin, CEO of Suomen Lauttaliikenne Oy.

[mappress] STX Europe, November 26, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free