Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Second DST Flows Gas to Surface at Heron South-1 (Australia)
Business & Finance

December 6, 2012 · about 13 years ago

Second DST Flows Gas to Surface at Heron South-1 (Australia)

MEO Australia Limited provides the following update in relation to Heron South-1 being drilled in NT/P68, operated by Eni Australia Ltd (Eni). Since the last report the second of the two planned production test programs has been run. Drill Stem Test (DST) #2 flowed gas to surface. Gas composition an

1 minutes read
  • LinkedIn
  • X
  • Email

MEO Australia Limited provides the following update in relation to Heron South-1 being drilled in NT/P68, operated by Eni Australia Ltd (Eni).

Since the last report the second of the two planned production test programs has been run.

Drill Stem Test (DST) #2 flowed gas to surface. Gas composition analysed by chromatograph is approximately 25% CO2. The information from both DST’s together with the observations made whilst drilling the well will be reviewed to determine the forward plans for the Heron area.

MEO’s CEO and MD Jürgen Hendrich commented on the announcement:

“Heron South-1 has confirmed the presence of gas in the Elang Plover reservoir significantly deeper than MEO’s pre-drill expectations and discovered gas in the Frigate formation above the main objective.

“The low flow rates observed during production testing indicates low primary reservoir permeability and the absence of secondary permeability (due to natural fractures) at the well location. MEO’s technical assessment predicts the possibility of natural fracturing at several locations in the Greater Heron structure which may provide the potential for areas of improved reservoir productivity.

“Our focus will move to the integration of the well results to remap and update the resource assessment. There is clearly a significant in-place gas resource at Heron. The key question to be addressed in the review is whether the reservoir is capable of higher productivity anywhere on the structure.”

[mappress]

December 6, 2012

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago