Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Teekay LNG Orders Two Newbuildings from DSME, South Korea
Shipbuilding

December 13, 2012 · about 13 years ago

Teekay LNG Orders Two Newbuildings from DSME, South Korea

Teekay LNG Partners L.P. today announced that it has entered into an agreement with Daewoo Shipbuilding & Marine Engineering CO., LTD., (DSME) of South Korea for the construction of two 173,400 cubic meter Liquefied Natural Gas (LNG) carrier newbuildings, with options to order up to three additional

2 minutes read
  • LinkedIn
  • X
  • Email

Teekay LNG Partners L.P. today announced that it has entered into an agreement with Daewoo Shipbuilding & Marine Engineering CO., LTD., (DSME) of South Korea for the construction of two 173,400 cubic meter Liquefied Natural Gas (LNG) carrier newbuildings, with options to order up to three additional vessels.

The Partnership intends to secure long-term contract employment for both vessels prior to their delivery in the first half of 2016. The newbuildings will be constructed with M-type, Electronically Controlled, Gas Injection (MEGI) twin engines, which are expected to be significantly more fuel-efficient and have lower emission levels than other engines currently being utilized in LNG shipping.

The contract with DSME includes a favorable installment payment schedule, with the majority of the purchase price due upon delivery. The Partnership intends to finance the installment payments during construction with a portion of its existing liquidity, which was approximately $420 million as of September 30, 2012 (after deducting the equity required to complete the recently announced Exmar LPG joint venture acquisition), and expects to secure long-term debt financing for the two vessels prior to their scheduled delivery.

“The delivery of these vessels is timed to coincide with the next wave of increased demand for LNG carriers which is expected when a large number of new LNG export projects come on-stream commencing from late-2015. They are also among the largest LNG carriers that will be able to transit the Panama Canal after its expansion project is complete, which makes them ideal for U.S. LNG exports. The recent U.S. Department of Energy study supported the export of LNG from the U.S.,” commented Peter Evensen, Chief Executive Officer of Teekay GP LLC . “In addition, we are confident these newbuildings will be especially attractive to our customers given their fuel-efficient engines as well as being built to a high specification at DSME.” Mr. Evensen continued, “With scheduled delivery in 2016, we believe that we are well-positioned to charter these LNG newbuildings on fixed-rate charter contracts prior to their delivery, thereby providing Teekay LNG with visible built-in growth.”

[mappress]

Teekay LNG, December 13, 2012; Image:

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free