The Methania liquefied natural gas carrier, with a capacity of 145,702 cubic metres, is due to arrive in the Zeebrugge LNG terminal on January 14, according to port data.
The liquefied natural gas carrier will probably load in a re-export cargo and depart from the Zeebrugge terminal on January 16.
The Zeebrugge LNG terminal is situated on a 30ha site in the outer port of Zeebrugge, Belgium.
It is operated by Fluxys LNG and has an annual throughput capacity of nine billion cubic meters (bcm) of natural gas.
[mappress]
LNG World News Staff, January 2, 2013; Image: Port of Zeebrugge