Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Ulstein Bags EPCI Contract for Baltic 2 Wind Farm Project (Germany)
Business & Finance

January 8, 2013 · about 13 years ago

Ulstein Bags EPCI Contract for Baltic 2 Wind Farm Project (Germany)

ArGe Baltic 2 foundations, a Joint Venture between Hochtief and GeoSea, has awarded Ulstein Idea Equipment Solutions BV a contract for the Engineering, Procurement, Construction and Installation (EPCI) of a complete pile upend as well as lifting tool for the Baltic 2 wind farm installation project.

2 minutes read
  • LinkedIn
  • X
  • Email

ArGe Baltic 2 foundations, a Joint Venture between Hochtief and GeoSea, has awarded Ulstein Idea Equipment Solutions BV a contract for the Engineering, Procurement, Construction and Installation (EPCI) of a complete pile upend as well as lifting tool for the Baltic 2 wind farm installation project.

By using basic laws of mechanical equilibrium, Ulstein Idea Equipment Solutions’ proprietary design ‘Simplicity Improves Safety’ (SIS) upend frame provides increased safety during pile upending operations by ensuring a balanced support and full control of the pile throughout the entire upending cycle, eliminating the risk of uncontrolled lateral forces (side lead) on the crane. Its improved geometric design, which is based on the proven “Saddle and Hook” upending technology, will also avoid the support cables to become slack and therefore prevent resulting shock loads.

“Ulstein Idea is proud to have been awarded the contract to supply this innovative equipment, as it is our passion and ambition to develop and supply equipment that enhances the operation and safety of work performed offshore,” says Arjan Boezeman, Director of Concepts and Sales. “This design eliminates the risks introduced in particular when upending large diameter piles using traditional slender pile upending methods. We are convinced that this design will set a new standard for safe upending of large diameter piles.”

The products will be delivered in Rostock in the summer of 2013 for final installation and commissioning onto the ‘Goliath’ Jack-up Platform that will be used for the installation of the foundations for the Baltic 2 Offshore Wind farm in the Baltic Sea, offshore Germany.

[mappress]

Press Release, January 08, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago