Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Alun Griffiths Prepares Port of Mostyn for Wind Turbines (UK)
Offshore Wind

January 14, 2013 · about 13 years ago

Alun Griffiths Prepares Port of Mostyn for Wind Turbines (UK)

Alun Griffiths (Contractors) Ltd has been awarded a GBP 1.1 million contract by RWE npower, the company behind the Gwynt-y-Mor Offshore Wind Farm, to prepare the turbine pre-assembly site at the Port of Mostyn. The civil engineering works are underway to establish a purpose built facility on a 28 ac

1 minutes read
  • LinkedIn
  • X
  • Email

Alun Griffiths (Contractors) Ltd has been awarded a GBP 1.1 million contract by RWE npower, the company behind the Gwynt-y-Mor Offshore Wind Farm, to prepare the turbine pre-assembly site at the Port of Mostyn.

The civil engineering works are underway to establish a purpose built facility on a 28 acre site where the turbine manufacturer Siemens will undertake assembly works of their 3.6 MW turbine. The required civil engineering works include the construction of a 14,682sq foot temporary office block, the preparation and compaction of lay down areas, haul roads as well as the installation of essential site infrastructure.

The site preparation works will be completed in Q1 2013 with the first turbine components expected to be delivered to the Port of Mostyn in January 2013.

For the turbine construction works, the project will employ in excess of 200 staff working at The Port of Mostyn. The construction of the Gwynt-y-Mor Wind Farm will take place during 2013-2014, and will see an array of 160 Siemens’ 3.6MW wind turbines established 15-20km off the coast of North Wales.

[mappress]

Press release, January 14, 2013; Image: Port of Mostyn

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindBusiness & FinancePorts & Logistics

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free