Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Production Resumed at Antrim’s Causeway Field in UK Northern North Sea
Business & Finance

January 21, 2013 · about 13 years ago

Production Resumed at Antrim’s Causeway Field in UK Northern North Sea

Production has resumed from Antrim’s Causeway Field (Antrim 35.5% interest) in the Northern North Sea, following a shut-in period of three days. The nearby Cormorant East Field (Antrim 8.4% interest) is expected to resume production in the next few days. This announcement is further to the announcem

1 minutes read
  • LinkedIn
  • X
  • Email

Production has resumed from Antrim’s Causeway Field (Antrim 35.5% interest) in the Northern North Sea, following a shut-in period of three days.

The nearby Cormorant East Field (Antrim 8.4% interest) is expected to resume production in the next few days. This announcement is further to the announcement of January 16, 2013 that the export infrastructure system (“Export System”) used by Causeway and Cormorant East was unavailable due to a precautionary shutdown of the Cormorant Alpha platform and the Brent Pipeline System.

Antrim has now been notified by the Export System Operator, TAQA Bratani Limited, that the flow of crude oil to the Brent Pipeline System has been restored. Cormorant Alpha production (which does not include production from Causeway or Cormorant East) remains shut-in.

Production from both Causeway and Cormorant East is processed at the North Cormorant platform before being exported in a co-mingled stream across the Cormorant Alpha platform to the Brent Pipeline System entry point (located on the Cormorant Alpha platform) for onward transportation to the Sullom Voe terminal and subsequent sale. Approximately 80,000 barrels of oil per day (“bopd”) of production from fields upstream of the Cormorant Alpha platform is exported via the Brent Pipeline System.

[mappress] Press Release, January 21, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

24 days ago

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

24 days ago
FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago