Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›SHE Transmission Awards MMT with Cable Route Survey Contract (UK)
Business & Finance

February 5, 2013 · about 13 years ago

SHE Transmission Awards MMT with Cable Route Survey Contract (UK)

Scottish Hydro Electric Transmission plc (SHE Transmission) has awarded MMT Sweden the HVDC cable re-route survey from Shetland to the Caithness landfall. SHE Transmission, which is part of the SSE Group, is planning to install a HVDC cable system between Shetland and Caithness, on the Scottish main

1 minutes read
  • LinkedIn
  • X
  • Email

Scottish Hydro Electric Transmission plc (SHE Transmission) has awarded MMT Sweden the HVDC cable re-route survey from Shetland to the Caithness landfall.

SHE Transmission, which is part of the SSE Group, is planning to install a HVDC cable system between Shetland and Caithness, on the Scottish mainland, to accommodate proposed renewable energy developments in Shetland.

In 2008 and 2010 MMT Sweden AB (former known as Marin Mätteknik AB) performed a geophysical, geotechnical and environmental survey of the previous design route for this cable system. The data presented large areas determined unsuitable for cable laying and a re-routing survey was therefore required.

Geophysical, geotechnical and environmental data will be collected along the new re-routing sections. MMT survey vessel Seabeam will perform the near shore survey at the Sinclairs Bay landfall and Franklin will be operated for the offshore areas. Together with the data collected during the previous survey campaigns a combined corridor between 1000m and 3500m in width along the length of the route will be presented.

The objective of the cable route survey is to determine water depth, sediment structure, identify seabed features and obstructions and to collect data for environmental and archaeological assessments.

The work will commence in Q1 2013.

[mappress]

Press release, February 5, 2013; Image: MMT

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago