Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Elia in Search of Contractors for Submarine Cable System (Belgium)
Business & Finance

February 15, 2013 · about 13 years ago

Elia in Search of Contractors for Submarine Cable System (Belgium)

Elia is seeking contractors for submarine HVAC cable system of Belgian Offshore Grid (BOG). The scope of the contract entails a complete installed cable system, which involves design, engineering, construction, supply, installation, burial, handling and commissioning of submarine 220KV AC power cabl

1 minutes read
  • LinkedIn
  • X
  • Email

Elia is seeking contractors for submarine HVAC cable system of Belgian Offshore Grid (BOG).

The scope of the contract entails a complete installed cable system, which involves design, engineering, construction, supply, installation, burial, handling and commissioning of submarine 220KV AC power cables including all necessary accessories, such as joints and terminations.

After commissioning, the tenderer can include operations, maintenance and repair. All provisions should be taken in order to install a RTTR (real time thermic rating system). The estimated total length is some 150 to 200 kilometers for the high voltage transmission. The lifespan of the cable system and installations should be 50 years.

The BOG project involves building offshore infrastructures off the Belgian coast in order to connect the wind farms in the Belgian North Sea.

Elia wants to connect future wind farms off the Belgian coast in the North Sea as efficiently as possible for the benefit of the community by creating a genuine offshore grid, thus laying the foundations for a large European offshore grid going forward.

The BOG project consists of 2 Offshore High Voltage Station (OHVS ) platforms, 1 submarine interconnection cable and 4 submarine cables to the onshore grid, of which the connection point is the Stevin location near Zeebrugge. One of the OHVS will be integrated in an artificial offshore island, the other OHVS will be installed on a fixed structure.

[mappress]

Subsea World News Staff , February 15, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago