Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Trenching Begins for Corrib Field Umbilical. Nerby Vessels Advised to Keep Clear (Ireland)
Business & Finance

February 26, 2013 · about 13 years ago

Trenching Begins for Corrib Field Umbilical. Nerby Vessels Advised to Keep Clear (Ireland)

The Department of Transport, Tourism and Sport announced that preparatory works for the installation of an offshore umbilical will be carried out from 54°20.34’N 011°03.51’W (Corrib Offshore Field Location) to 54° 17.00’N 009° 49.24’ W (landfall). The area of activity stretches along the route of th

1 minutes read
  • LinkedIn
  • X
  • Email

The Department of Transport, Tourism and Sport announced that preparatory works for the installation of an offshore umbilical will be carried out from 54°20.34’N 011°03.51’W (Corrib Offshore Field Location) to 54° 17.00’N 009° 49.24’ W (landfall). The area of activity stretches along the route of the existing Corrib offshore gas pipeline. The Corrib natural gas field lies some 83km off the north west coast of Ireland, approximately 3,000 metres under the seabed and in waters 350 metres deep.

Works will commence in early March 2013 with a route survey and pre-cut trenching.

The vessel to be used during this initial works scope will be the Trenching Support Vessel with multipass plough “Normand Ranger” (Call sign LAMT).

Detailed scope of work

A pre-trenching route survey will be carried out on the whole length of the umbilical lay route. A trench will be constructed from the subsea facilities and wells in the Corrib gas field to approx 16km offshore by utilising a subsea plough. The plough will be pulled by the trenching support vessel and could trail as far as 1700 metres behind the support vessel.

The authorities advised that all vessels in the vicinity should keep clear of the works as these works progress along the pipeline route and should comply with requests from support vessels and safety boats.

[mappress]

February 26, 2013; Image: Solstad

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

21 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

21 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

21 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

21 days ago