Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Tenders Invited for Piling Work at Innogy Nordsee 1 Offshore Wind Farm (Germany)
Business & Finance

March 15, 2013 · about 13 years ago

Tenders Invited for Piling Work at Innogy Nordsee 1 Offshore Wind Farm (Germany)

RWE’s Innogy Nordsee 1 GmbH has issued an invitation to tender on piling work at its Offshore Wind Farm Innogy Nordsee 1. This includes the supply of substructure and foundations for wind turbine generators (WTG), installation of topside and substructure and/or installation of substructure and found

2 minutes read
  • LinkedIn
  • X
  • Email

RWE’s Innogy Nordsee 1 GmbH has issued an invitation to tender on piling work at its Offshore Wind Farm Innogy Nordsee 1.

This includes the supply of substructure and foundations for wind turbine generators (WTG), installation of topside and substructure and/or installation of substructure and foundation for WTG.

Each substructure and foundation consists of one monopile and a transition piece. The certified design for the 54 standard steelwork monopile substructures and foundations will be delivered by the contracting entity.

Innogy Nordsee 1 GmbH plans to involve the contractor during the detailed design phase of the substructures and foundations. This allows the contractor to modify the detailed design as needed for its fabrication facilities. This design will be an integral part of the contract to be awarded. Alternatively, the contractor is entitled to develop foundations with their own certified / certifiable (basic and detailed) design in the existing time frame.

The second part of the tender, called Lot 10.02, is related to installation of topside and substructure. This involves the optional installation of one substation that consists of one topside and one substructure and foundation for the topside. The substructure and foundation shall be a standard braced steelwork jacket substructure and foundation including four piles.

The third and last part, called Lot 10.05, includes installation of substructure and foundation for WTGs. This consists of the installation of at least 44 and maximum 54 substructures and foundations. Each substructure and foundation comprises one monopile and a transition piece.

Tenders may be submitted for a part or the whole project.

The Innogy Nordsee 1 Offshore Wind Farm is situated approximately 32 kilometres north of the island of Juist, between the traffic separation area Terschelling-German Bight and German Bight Western Approach.

[mappress]

Offshore WIND Staff, March 15, 2013; Image: RWE

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

21 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

21 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

21 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

21 days ago