Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Australia: Dredger “Rotterdam” Completes Its Work on WBDDP
Business & Finance

March 18, 2013 · about 13 years ago

Australia: Dredger “Rotterdam” Completes Its Work on WBDDP

The trailing suction hopper dredge Rotterdam has completed its work on the Western Basin Dredging and Disposal Project (WBDDP) and is currently demobilising to leave the Gladstone harbour. The Rotterdam arrived in the Gladstone harbour in October 2012 to perform dredging works in order to provide ac

1 minutes read
  • LinkedIn
  • X
  • Email

The trailing suction hopper dredge Rotterdam has completed its work on the Western Basin Dredging and Disposal Project (WBDDP) and is currently demobilising to leave the Gladstone harbour.

The Rotterdam arrived in the Gladstone harbour in October 2012 to perform dredging works in order to provide access for Liquefied Natural Gas (LNG) shipping vessels to the LNG sites on Curtis Island.

The Rotterdam removed dredge material from the seabed and placed the material at the East Banks offshore site, an approved site outside of the Great Barrier Reef Marine Park, which has been in use by the Gladstone Ports Corporation (GPC) for over 20 years.

The departure of the Rotterdam marks the end of the use of the East Banks off shore disposal site by the WBDDP. Approximately 4.4 million cubic metres of dredge spoil was deposited at the East Banks off shore disposal site during the WBDDP under strict regulatory and monitoring conditions.

The Rotterdam operated as part of the WBDDP under the comprehensive water quality and seagrass monitoring programme.

There are currently two dredges operating on the WBDDP, the Al Mahaar ar6 Castor both cutter suction dredges, However, the Al Mahaar is currently under maintenance. The Al Mahaar and Castor both pump dredge material to the Western Basin reclamation area.

[mappress]

Press Release, March 18, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

15 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

15 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

15 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

15 days ago