Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Cathelco Supply ICCP System for FPSO Armada Claire
Business & Finance

March 25, 2013 · about 13 years ago

Cathelco Supply ICCP System for FPSO Armada Claire

Cathelco have won an order to supply the FPSO Armada Claire with an impressed current cathodic protection (ICCP) system which will safeguard the hull of the vessel against corrosion. The Armada Claire, owned by Bumi Armada, is currently being modified and upgraded at the Keppel Shipyard in Singapore

1 minutes read
  • LinkedIn
  • X
  • Email

Cathelco have won an order to supply the FPSO Armada Claire with an impressed current cathodic protection (ICCP) system which will safeguard the hull of the vessel against corrosion.

The Armada Claire, owned by Bumi Armada, is currently being modified and upgraded at the Keppel Shipyard in Singapore. This will include refurbishment and life extension works as well as the installation and integration of topside modules.

When the work is complete at the end of the conversion, the vessel will be deployed in the Balnaves Field, 180km off north-west Australia.

With a length of 240 metres, the Armada Claire will be installed with a forward and aft Cathelco ICCP system. The forward 200amp forward system will consist of a control panel wired to an arrangement of two Cathelco C-Max disc and reference electrodes mounted port and starboard. The more powerful aft system will comprise a 400amp thyristor control panel connected to two C-Max linear loop anodes and reference electrodes.

C-Max are a new generation of anodes which were introduced by Cathelco in 2012. The main advantage is that they are diver changeable and can be replaced without the need for drydocking. In addition, they provide a high current output from a relatively small surface area and are easy to install using self snapping torque nuts, avoiding the use of torque wrenches.

[mappress] Press Release, March 25, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago