Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Matrix, Allseas to Provide Buoyancy for Chevron’s Wheatstone Project in WA
Business & Finance

April 11, 2013 · about 13 years ago

Matrix, Allseas to Provide Buoyancy for Chevron’s Wheatstone Project in WA

Matrix Composites & Engineering (Matrix) announces it has entered into an agreement with Allseas for the supply of rigid pipeline installation buoyancy for the Chevron-operated Wheatstone Project in Western Australia. The agreement will aid in sustaining the local manufacturing industry and support

2 minutes read
  • LinkedIn
  • X
  • Email

Matrix Composites & Engineering (Matrix) announces it has entered into an agreement with Allseas for the supply of rigid pipeline installation buoyancy for the Chevron-operated Wheatstone Project in Western Australia.

The agreement will aid in sustaining the local manufacturing industry and support 225 local jobs, particularly in Kwinana and Rockingham. Under the agreement, 35 people will be directly involved in manufacturing the product, with an additional 190 shop floor staff involved with the manufacturing process.

Matrix will supply 70 four tonne installation buoyancy assemblies to the Wheatstone Project. The buoyancy will be used to reduce the weight of the project’s 44 inch carbon steel, concrete coated rigid subsea pipeline as it is installed along 225km of ocean floor.

Matrix’s installation buoyancy is manufactured using composite syntactic foam and composite laminate technologies. Its design, whilst engineered specifically to the requirements of the Wheatstone project can also be used on other projects with pipelines of varying diameters. The installation buoyancy will be manufactured at the company’s new 20,000m2 composites syntactic foam plant in Henderson, Western Australia.

Matrix’s CEO Aaron Begley said Matrix is thrilled to have secured the Allseas contract for installation buoyancy which will be used on the Chevron operated Wheatstone Project.

“The contract shows that local companies can win work on major energy and resources projects if they are competitive on a global scale.”

“As the only manufacturer of subsea buoyancy systems in the southern hemisphere, Matrix operates out of the world’s largest, most technically advanced composite syntactic foam plant. This allows us to manufacture greater quantities of high quality product within shorter timeframes. Delivery times are also reduced when supplying local operators such as Allseas or clients based in Asia. At Matrix, we also invest heavily in intellectual property which gives us a further competitive advantage in regards to product innovation and differentiation.”

[mappress]

Press Release, April 11, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

21 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

21 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

21 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

21 days ago