Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Piet Brouwer to Supply Electrical Installations for New Multipurpose Vessels
Shipbuilding

April 19, 2013 · about 13 years ago

Piet Brouwer to Supply Electrical Installations for New Multipurpose Vessels

Piet Brouwer Electrotechnology in the Netherlands has received the order to supply and install the electrical installations on four newly built multipurpose heavy lift vessels. The Groningen yard Shipkits, part of the Centraal Steel group, is building the vessels for the Daniel Hartman shipping comp

1 minutes read
  • LinkedIn
  • X
  • Email

Piet Brouwer Electrotechnology in the Netherlands has received the order to supply and install the electrical installations on four newly built multipurpose heavy lift vessels. The Groningen yard Shipkits, part of the Centraal Steel group, is building the vessels for the Daniel Hartman shipping company in Urk.

The four vessels will have a deadweight of 4,200 tons and each be equipped with two 150-ton cranes. The vessels have a length of 111.60 metres and a beam of 16.8 metres, combined with a top speed of approximately 17 knots, which is relatively fast for this category. The hulls are currently under construction at Shipkits’s Polish yard, with the first due to arrive in the port of Urk in the middle of April for outfitting.

Piet Brouwer Electrotechnology previously supplied electrical systems for Daniel’s brother, Johan Hartman, who also owns a shipping company in Urk. This included the recently launched Oceanic, the first of three new vessels in the Hartman M2 Runner series, which consists of general cargo/heavy cargo vessels with open top notation. The Oceanic (92.9 x 15; 2,978 gt; 3,500dwt) can transport twice the amount of wind turbine parts as other 3,000-ton vessels. The second in the series of M2 runners, the Nordic, is currently being finished in the port of Urk. The third, the Arctic, is expected to arrive in September 2013.

[mappress] Piet Brouwer, April 19, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free