Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›First Submarine Cable Section Laid for Baltic 2 OWF in Germany
Business & Finance

April 23, 2013 · about 13 years ago

First Submarine Cable Section Laid for Baltic 2 OWF in Germany

The work for the network connection of the second German offshore wind farm in the Baltic Sea, the EnBW Baltic 2, is in progress. The vessel Aura rinsed the first submarine cable section into the Baltic ground, on Saturday, 20 April 2013, for the connection of Baltic 2. A total of sixty kilometers o

1 minutes read
  • LinkedIn
  • X
  • Email

The work for the network connection of the second German offshore wind farm in the Baltic Sea, the EnBW Baltic 2, is in progress.

The vessel Aura rinsed the first submarine cable section into the Baltic ground, on Saturday, 20 April 2013, for the connection of Baltic 2.

A total of sixty kilometers of submarine cables will be laid in the coming months, before the cable ends are ultimately lifted again to the surface and the sections are connected with special joints. Also, for the connection of Baltic 2, a second submarine cable from the Baltic 1 platform is laid to the landfall in Markgrafenheide near Rostock. From there, the land cable route leads to the Bentwisch transformer station.

50 Hertz will make the network connection available when the first wind turbines in the Baltic 2 offshore wind farm feed in.

The EnBW Baltic 2 significantly outperforms EnBW Baltic 1 (48 MW), with its planned eighty wind turbines and a total installed capacity of 288 megawatts (MW). Much greater distance from the coast, water depths under thirty meters and a varying soil present much higher demands on engineers and technicians who are building the wind farm and the grid connection.

[mappress] April 23, 2013; Image: EnBW

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago