Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Hertel Offshore Inks Contract with HHI for Aasta Hansteen Living Quarter
Shipbuilding

April 29, 2013 · about 13 years ago

Hertel Offshore Inks Contract with HHI for Aasta Hansteen Living Quarter

Hertel Offshore have signed a €70 million contract with Hyundai Heavy Industries for the engineering, design and construction (EPC) of the new accommodation for Statoil’s Aasta Hansteen platform. This is another big Norwegian contract for Hertel Offshore and follows on from the award for Statoil’s V

2 minutes read
  • LinkedIn
  • X
  • Email

Hertel Offshore have signed a €70 million contract with Hyundai Heavy Industries for the engineering, design and construction (EPC) of the new accommodation for Statoil’s Aasta Hansteen platform.

This is another big Norwegian contract for Hertel Offshore and follows on from the award for Statoil’s Valemon Living Quarter (LQ) project in 2011 and the Shell Norge Draugen Additional Living Quarter project in 2012, both currently under construction in the Rotterdam facility. The project is on a lump sum EPC basis and will draw on the in-house capabilities of Hertel Offshore. Work has already started and delivery is scheduled for April 2015. Design will be based on the stringent Norsok standards and Statoil requirements. Several Hertel innovations will be used including prefab cabins to facilitate an efficient construction process.

Peter van Aken, Managing Director said: “We are very proud to work alongside Hyundai Heavy Industries and it is a privilege to build such a state of the art LQ. This project will also further strengthen Hertel’s presence on the Norwegian Continental Shelf.”

The Aasta Hansteen Living Quarter will be made of steel and will accommodate 108 persons. The five storey building weighs approx. 2,600 tonnes and will be fully equipped with everything required for offshore operations, such as galley, recreational area, medical room, control room and heli deck.

The Aasta Hansteen gas field is located on Blocks 6706/12, 6707/10, roughly 186 miles (300 kilometers) from land in 4,265 feet (1,300 meters) of water in the Norwegian sector of the North Sea. Statoil serves as the operator, holding a 75% interest; OMV holds 15%; and ConocoPhillips holds the remaining 10% interest.

[mappress]

Hertel Offshore, April 29, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free