Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Dredger “Macuti” Delivered (Lithuania)
Business & Finance

May 2, 2013 · about 13 years ago

Dredger “Macuti” Delivered (Lithuania)

On the 29th of April 2013, Western Baltija Shipbuilding delivered a 2500 m3 TSHD turn-key dredger “Macuti“ to Johs. Gram-Hanssen A/S after a building period of 20 months. Extensive tests and trials of all systems kept Western Baltija Shipbuilding specialists busy in the last weeks. One week before t

2 minutes read
  • LinkedIn
  • X
  • Email

On the 29th of April 2013, Western Baltija Shipbuilding delivered a 2500 m3 TSHD turn-key dredger “Macuti“ to Johs. Gram-Hanssen A/S after a building period of 20 months. Extensive tests and trials of all systems kept Western Baltija Shipbuilding specialists busy in the last weeks.

One week before the delivery, dredger “Macuti” was named at Western Baltija Shipbuilding 24 April 2013. The Name Giving Ceremony of NB50 was held according to old traditions. The ceremony was attended by the representatives of Western Baltija Shipbuilding, Johs. Gram-Hanssen A/S, Rohde Nielsen A/S, CFM EMODRAGA, OSK Design Denmark. The naming was done by the Sponsor of the vessel Mr. Silvio Kun, Executive Member of the Board of CFM EMODRAGA.

The dredger “Macuti” is the first vessel of this type built in Lithuania. The name MACUTI refers to the lighthouse situated at the beach outside Beira (in the Republic of Mozambique, Africa) where the vessel will be operating. MACUTI lighthouse was built in 1904 and is one of the lighthouses in Sofala Province in Mozambique.

The contract on the dredger’s building between Wetern Baltija Shipbuilding and the Danish company, Johs. Gram-Hanssen A/S was signed on 16th of November, 2010. Almost one year passed as the first sheet of steel for the vessel was cut, i.e. in August, 2011.

The dredger’s length – 82 m, width – 16m, deadweight – 3900 tons and the maximum draft – 5.50 m. The dredger is equipped with two 1,720 kW main engines and one 1935 kW dredge engine all 3 engines delivered by MAN-DIESEL.

The capacity of the hopper dredger is 2500 m3. The baseline design of the dredger was prepared by the Swedish company FKAB, while operational and technical documentation was prepared by the Western Baltic Engineering, the subsidiary company of the Western Shipyard. The shipbuilding process was supervised by the classification society Bureau Veritas. The dredger MACUTI will operate near the coasts of Africa, in the port of Beira in the Republic of Mozambique, where a new terminal is being built.

[mappress]

Press Release, May 2, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnologyVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago