Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Australia: Pilbara Apollo Escort Tug Joins Rio Tinto’s Fleet
Shipbuilding

May 10, 2013 · about 13 years ago

Australia: Pilbara Apollo Escort Tug Joins Rio Tinto’s Fleet

The Pilbara Apollo, the latest addition to the RAstar 3200 escort tug series was delivered to its owners, Rio Tinto Ltd. earlier this year. The vessel was constructed at Uzmar Shipbuilding Industry Co. in Turkey and will operate at Rio Tinto’s iron ore export facilities at Cape Lambert (Port Walcott

3 minutes read
  • LinkedIn
  • X
  • Email

The Pilbara Apollo, the latest addition to the RAstar 3200 escort tug series was delivered to its owners, Rio Tinto Ltd. earlier this year. The vessel was constructed at Uzmar Shipbuilding Industry Co. in Turkey and will operate at Rio Tinto’s iron ore export facilities at Cape Lambert (Port Walcott) and Dampier, Australia.

The Pilbara Apollo is the first of six new RAstar 3200 tugs to be delivered to Rio Tinto as part of this contract. These tugs will assist very large ore carriers in berthing and un-berthing at exposed, open water berths in severe wind and wave conditions.

The unique sponsoned hull form of the RAstar Class vessels gives these new tugs a level of safety and comfort that will enable operation in conditions that were previously deemed unworkable. This unique RAstar hull form developed by Robert Allan Ltd. has been proven in both model and full-scale testing to provide significantly enhanced escort towing and seakeeping performance. The motions and accelerations are less than half those of comparable sized, wall- sided “standard” tug hulls.

Particulars of the Pilbara Apollo are as follows:

Length overall: 32.00 m (excluding fenders)

Beam, moulded: 12.80 m

Depth, moulded (hull): 5.37 m

Navigational draft (DWL): 6.03 m

Pilbara Apollo was classed by Bureau Veritas during construction, but will be converted to Lloyd’s Register once in Australia.

On trials, Pilbara Apollo met or exceeded all performance expectations, with the following results:

Bollard Pull, ahead: 80.9 tonnes

Bollard Pull, astern: 77.0 tonnes

Free Running speed, ahead: 14.0 knots

Main propulsion for each tug comprises a pair of CAT 3516C HD diesel engines, each rated 2350 kW at 1800 rpm, and each driving a Rolls Royce US255 Controllable Pitch Z-drive unit.

The hydraulic deck machinery, all from Ridderinkhof, consists of a split-drum escort hawser winch on the foredeck, and a single drum towing winch aft.

The electrical plant consists of two CAT C6.6 diesel gen-sets, each with a power output of 100 ekW. The vessel has been outfitted to the highest standards for a crew of up to 6 people. The lower deck contains crew quarters and the Master and Chief Engineer staterooms. The wheelhouse is designed for maximum all-round visibility with a forward control station providing maximum visibility to both fore and aft deck working areas.

Ship-handling fenders at the bow consist of two rows of 1,000 mm deep, 1,400 mm wide custom designed “W” fenders. Extruded hollow 300 x 300 square section rubber fenders provide protection at the main sheer line, and 500 mm wide by 450 mm deep “W” block type fendering is used at the stern. The fendering system was devised by the Owner’s representative Neil Edwards, working in close cooperation with the design team at Robert Allan Ltd. and the fender suppliers, Maritime International. The fendering system was subject to extensive FEA analysis to verify the responses and loads. Early indications from the operators are that this solution will perform very well in the rough sea conditions.

[mappress] Robert Allan, May 10, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free