Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Resaca Dredging Project Moves Forward (USA)
Business & Finance

May 14, 2013 · about 13 years ago

Resaca Dredging Project Moves Forward (USA)

Along the banks of the Cemetery Resaca in the historic Old City Cemetery in Brownsville, the Brownsville Public Utilities Board officially recently marked the launch of the Resaca Restoration Project. BPUB workers, special guests and residents from the neighborhood attended the ceremony marking the

2 minutes read
  • LinkedIn
  • X
  • Email

Along the banks of the Cemetery Resaca in the historic Old City Cemetery in Brownsville, the Brownsville Public Utilities Board officially recently marked the launch of the Resaca Restoration Project. BPUB workers, special guests and residents from the neighborhood attended the ceremony marking the cleanup efforts.

BPUB General Manager & CEO John S. Bruciak served as master of ceremonies at the event, introducing various key officials to speak about the occasion. Speakers at the event included: Brownsville Mayor Tony Martinez; BPUB Chairman Enrique G. Najera; BPUB Vice-Chairman Oscar D. Garcia; BPUB Board Member Arturo R. Faras; Annemarie Whitko, M.S., civil engineering project manager with Ambiotec Engineering Group Inc.; Michael Hodges, president & CEO of Genesis Water; and Dr. Jude Benavides, associate professor of Environmental Sciences at the University of Texas at Brownsville.

After the speeches had concluded, Mayor Martinez asked everyone to join him along the resaca banks. With bull horn in hand, he called out to the dredger floating in the water, “ Gentleman, start your engine .” The man at the helm of the dredger responded by sounding off twice with the boat’s horn before starting up the dredger’s engine.

Once the dredger started up, the crowd observed the dredger in action before being invited to the dewatering area. Outside the dewatering area, the crowd was greeted by two piles of debris. One was resaca debris collected and processed through the dredger, while the other was larger resaca debris that had been manually collected by the BPUB crew since the beginning of the dredging. The gate was then opened, and Project Manager Rene Mariscal explained the dewatering process to the crowd.

Attendees were then granted access to the work area to get a closer look at the operation. They were able to view the darkened water coming directly from the resaca being spit into machinery and then the resulting clear water coming out another pipe and being returned into the resaca.

This is just the first step of a long process. The dredging of the Cemetery Resaca is estimated to take about three months, but that largely depends on what is found in the resaca. Large debris necessitates manual removal because it is not able to be suctioned through the dredger. Also, the amount of sediment that needs to be removed could also factor into the schedule. The most important thing is doing the job right and removing all unnecessary material before moving on to the next resaca.

[mappress]

Press Release, May 14, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago