Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›IMCA Releases Guidelines for Installing ROV Systems on Vessels or Platforms
Shipbuilding

May 17, 2013 · about 13 years ago

IMCA Releases Guidelines for Installing ROV Systems on Vessels or Platforms

The International Marine Contractors Association (IMCA) has published ‘Guidelines for installing ROV systems on vessels or platforms’ (IMCA R018). The new publication is aimed at vessel and platform owner/operators and designers, ROV contractor representatives, client and contractor staff who prepar

2 minutes read
  • LinkedIn
  • X
  • Email

The International Marine Contractors Association (IMCA) has published ‘Guidelines for installing ROV systems on vessels or platforms’ (IMCA R018). The new publication is aimed at vessel and platform owner/operators and designers, ROV contractor representatives, client and contractor staff who prepare bid documents and contracts, installation and rig managers, vessel and ROV managers, and vessel designers and builders.

The purpose of IMCA R018 is to provide guidance on the installation of a remotely operated vehicle (ROV) System, or Systems, on to vessels and/or platforms. It is not intended to be a definitive guideline; instead it is intended to assist vessel and platform owners to understand the outline requirements of installing and mobilising an ROV System, i.e. to highlight some of the questions that may need to be asked. It can also be utilised in discussions with ship and platform owners, designers and fabricators/builders when build specifications are being prepared.

“There are wide variations in the complexity and requirements of ROV Systems, ranging as they do from small observation class ROV Systems weighing perhaps 10 tons, through to large and complex trenching ROV Systems which might weigh hundreds of tons. Therefore it is important to discuss ROV installation issues with all the relevant stakeholders at the earliest opportunity,” says Jane Bugler, IMCA’s Technical Director .

“Every time you pack a suitcase or a car boot (‘trunk’ for our US colleagues) you’re practising spatial awareness – try fitting an ROV System on board a vessel, and you really realise what spatial awareness is all about! You are looking not just at the ROV itself, but at the whole ROV System with all its required equipment such as the launch and recovery system (LARS), the tether management system (TMS), the control cabin, the workshop cabin, the umbilical winch as well as the ROV (the vehicle) itself.

“In the new guidelines we state that the term ‘ROV System’ defines all the required equipment, and use a lower case ‘system’ in the new document to refer to sub-elements of the System as a whole, such as the hydraulic system or electrical system.”

Whilst the main body of the new document describes the issues that may arise during the installation for a work class ROV System on to a vessel or platform, the principles outlined are applicable to all classes and variants of ROV.

Sections of the 20-page document encompass ROV Classification; ROV System Layout; ROV System Services; Operational Requirements, and there is a useful appendix -Suggested ROV System Checklist.

[mappress] IMCA, May 17, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free