Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Limited Navigation Resumes at Marseilles Lock and Dam (USA)
Business & Finance

May 17, 2013 · about 13 years ago

Limited Navigation Resumes at Marseilles Lock and Dam (USA)

The Unified Command announced Wednesday that limited navigation through the Marseilles Lock and Dam resumed following the elevation of the navigational pool by the U.S. Army Corps of Engineers. The Marseilles pool was elevated to its navigable level late Wednesday afternoon. Commercial vessels began

2 minutes read
  • LinkedIn
  • X
  • Email

The Unified Command announced Wednesday that limited navigation through the Marseilles Lock and Dam resumed following the elevation of the navigational pool by the U.S. Army Corps of Engineers.

The Marseilles pool was elevated to its navigable level late Wednesday afternoon. Commercial vessels began transiting around 4 p.m. Navigation notices have been coordinated and broadcasted to mariners to inform them of navigation restrictions.

The Coast Guard continues to enforce a Regulated Navigation Area from the Marseilles Lock at mile marker 244.6 to the Gum Creek Light and Daymark at mile marker 247.8. Commercial and recreational vessels intending to pass through the Marseilles Lock must receive permission from the Coast Guard Captain of the Port in advance of intended lockage by contacting (630) 336-0300. The Marseilles Lock will be available to recreational traffic daily at 3:30 p.m. for southbound transits, and 4:15 p.m. for northbound transits. All vessels are prohibited from transiting, anchoring or operating within the Regulated Navigation Area without the approval of the Captain of the Port.

Earlier this week, navigation through the lock and dam was restricted and the navigational pool level was dropped to enable the Army Corps of Engineers to complete construction of a temporary rock dike just below the dam. The dike was built to reduce river flows and facilitate repairs to the dam.

The Marseilles Dam was damaged during an incident April 18 when seven barges broke loose from a tow during historic flooding on the Illinois River. Four of the seven barges were removed through salvage operations in April. Another barge containing iron ore was unloaded and safely removed out of the area on Tuesday. Salvage operations on the two remaining barges will be on hold until the specialized salvage equipment arrives this weekend or early next week.

Vessels transiting through the Marseilles Lock and Dam may experience occasional interruptions or restrictions on navigation while repair operations continue at the dam.

[mappress]

Press Release, May 17, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

14 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

14 days ago