Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›UK: IMCA Releases Guidance on Dynamically Positioned Jack-Up Vessels
Business & Finance

May 17, 2013 · about 13 years ago

UK: IMCA Releases Guidance on Dynamically Positioned Jack-Up Vessels

An increasing number of members of the International Marine Contractors Association (IMCA) are involved with the offshore renewables sector and for this reason the association has published ‘Guidance for the Positioning of Dynamically Positioned (DP) Jack-up Vessels on and off the Seabed” (IMCA M223

2 minutes read
  • LinkedIn
  • X
  • Email

An increasing number of members of the International Marine Contractors Association (IMCA) are involved with the offshore renewables sector and for this reason the association has published ‘Guidance for the Positioning of Dynamically Positioned (DP) Jack-up Vessels on and off the Seabed” (IMCA M223) and an updated version of their information note The Inspection and Auditing of Manned and Unmanned Barges’. Both are aimed at ensuring and enhancing offshore safety.

“The aim of IMCA M223 is to provide the owners and operators of dynamically positioned (DP) jack-up vessels with guidance to create procedures for going onto and leaving location,” explains IMCA’s Technical Director, Jane Bugler. “A DP system interfaces with the vessel’s propulsion systems to hold the vessel in position against external forces (such as wind and waves) that are acting to move the vessel.

“For DP vessels with jack-up capability – when a vessel moves into position on DP but intends to undertake the work on location as a jack-up vessel – there can potentially be excessive stresses induced into the legs during the transitional period from being on DP to ‘leg touchdown’ to soft pinning of the legs. The first leg contact with the seabed will restrict the vessel’s motion which may indicate a position error to the DP system. This could the lead to an increase of thrust of the vessel’s positioning propulsion systems and consequently may impart these excessive stresses on the legs.”

IMCA M223 has sections on Risk Analysis (vessel characteristics; environmental conditions and loading; site specific assessment integrity; and DP specification and performance); Background Material (that encompasses company procedures; vessel procedures; and information for each location); and covers Procedures for a DP Jack-up Vessel Going on and Leaving Location.

[mappress] Press Release, May 17, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

20 days ago

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

20 days ago
FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

20 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

20 days ago