Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Sweden: Cable Repair Starts at Lillgrund OWF
Offshore Wind

May 24, 2013 · about 13 years ago

Sweden: Cable Repair Starts at Lillgrund OWF

Since May 12, the Lillgrund offshore wind farm has been standing still. The work to repair the export cable – which transmits the electricity from the wind farm to the substation on land – is underway. “Our focus is to replace the damaged section of the cable as soon as possible and get the producti

1 minutes read
  • LinkedIn
  • X
  • Email

Normal 0 21 false false false BS-LATN-BA X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin-top:0cm; mso-para-margin-right:0cm; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0cm; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-fareast-language:EN-US;}

Since May 12, the Lillgrund offshore wind farm has been standing still. The work to repair the export cable – which transmits the electricity from the wind farm to the substation on land – is underway.

“Our focus is to replace the damaged section of the cable as soon as possible and get the production up and running again,” says Fredrik Forslund, site manager at Lillgrund . “Yesterday, May 23, we got the green light from the County Administration to begin work to replace the damaged part of the export cable.”

Weather permitting, the plan is to cut and remove the damaged part of the export cable on Monday, May 27. About 75 meters of the 7 kilometer long submarine cable needs to be replaced.

After the cable section is removed from the seabed, it will be analyzed to determine what caused the damage.

[mappress]

Offshore WIND Staff, May 24, 2013; Image: Vattenfall

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindOperations & MaintenanceStorage

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free