Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›IHC Merwede Hands Over New TSHD to YEWAB
Shipbuilding

May 27, 2013 · about 13 years ago

IHC Merwede Hands Over New TSHD to YEWAB

IHC Merwede has recently delivered the CHANG JIANG KOU 02 to Yangtze Estuary Waterway Administration Bureau (YEWAB) in Shanghai. The impressive 12,000m³ trailing suction hopper dredger was handed over to YEWAB Director, Mr Lu Shi Ming. IHC Merwede’s contract with YEWAB included the design, construct

2 minutes read
  • LinkedIn
  • X
  • Email

IHC Merwede has recently delivered the CHANG JIANG KOU 02 to Yangtze Estuary Waterway Administration Bureau (YEWAB) in Shanghai. The impressive 12,000m³ trailing suction hopper dredger was handed over to YEWAB Director, Mr Lu Shi Ming.

IHC Merwede’s contract with YEWAB included the design, construction and delivery of two identical vessels: the CHANG JIANG KOU 02, built in conjunction with the company’s Chinese partner’s yard; and her sister vessel, the CHANG JIANG KOU 01, which was delivered in May last year.

The efficient planning and control of the production process ensured that the CHANG JIANG KOU 02 was delivered on schedule. This demonstrates the reliability of not only IHC Merwede, but also its partner in China, on an international scale.

Both vessels – named after the mouth of the Yangtze River – have been specifically designed with the high-current velocity and soil properties of the River in mind. This is one of the reasons why the vessels are equipped with the patented IHC Merwede Wild Dragon® draghead and have already successfully carried out maintenance dredging jobs over a distance of 122km.

Fer Tummers, Managing Director of IHC Global Production , part of IHC Merwede, says: “This has proven to be a truly unique project for IHC Merwede. It is the first time that the company has had total responsibility for building such a large and complex vessel in China.

“In addition, the project has been completed successfully and on schedule, and the feedback from the customer has been extremely positive. This is a credit to the overall performance and cooperation of the international team involved – spread over different geographical locations and time zones.”

[mappress]

IHC Merwede, May 27, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free