Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›DSME Cuts First Steel for Ichthys FPSO (South Korea)
Shipbuilding

June 19, 2013 · about 13 years ago

DSME Cuts First Steel for Ichthys FPSO (South Korea)

The INPEX-operated Ichthys LNG Project (the Project) cut first steel yesterday for the hull of its Floating Production, Storage and Offloading (FPSO) facility in Okpo, Korea. With fabrication of the hull underway, work on all of the Project’s major offshore facilities has commenced. The FPSO is bein

1 minutes read
  • LinkedIn
  • X
  • Email

The INPEX-operated Ichthys LNG Project (the Project) cut first steel yesterday for the hull of its Floating Production, Storage and Offloading (FPSO) facility in Okpo, Korea.

With fabrication of the hull underway, work on all of the Project’s major offshore facilities has commenced.

The FPSO is being built by Daewoo Shipbuilding & Marine Engineering (DSME). The vessel will be used for condensate dewatering, stabilisation, storage and export.

Speaking at today’s ceremony at the DSME shipyard, INPEX Ichthys LNG Project Director Offshore Claude Cahuzac said the steel cutting marked a major milestone.

“ Starting fabrication on the FPSO hull means that work is now underway on all major offshore facilities – this includes the Central Processing Facility, subsea structures and the Gas Export Pipeline ,” Mr Cahuzac said.

“ It marks the culmination of years of engineering work and close collaboration with our contractors. ”

“ It is fantastic to celebrate this milestone, on schedule, as we work towards delivering first gas by the end of 2016 .”

The FPSO will be permanently moored for the life of the Project to the seabed in the Browse Basin, offshore Western Australia.

Condensate will be offloaded periodically to crude oil tankers and shipped directly to market.

[mappress] Inpex, June 19, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free