Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Steel Cutting Ceremony for PETRONAS’ First FLNG (South Korea)
Shipbuilding

June 25, 2013 · about 13 years ago

Steel Cutting Ceremony for PETRONAS’ First FLNG (South Korea)

A steel cutting ceremony for the hull of PETRONAS’ first Floating Liquefied Natural Gas (FLNG) facility was held yesterday at the Daewoo Shipbuilding & Marine Engineering (DSME) shipyard in Okpo, South Korea. The steel cutting event signifies a major milestone for the project, the world’s first, to

1 minutes read
  • LinkedIn
  • X
  • Email

A steel cutting ceremony for the hull of PETRONAS’ first Floating Liquefied Natural Gas (FLNG) facility was held yesterday at the Daewoo Shipbuilding & Marine Engineering (DSME) shipyard in Okpo, South Korea.

The steel cutting event signifies a major milestone for the project, the world’s first, to proceed to its construction phase to meet its commissioning schedule in 2015.

The ceremony was led by PETRONAS’ President and Group CEO, Tan Sri Dato’ Shamsul Azhar Abbas and was jointly hosted by Technip’s President & CEO Mr. Thierry Pilenko and DSME’s President & CEO Mr. Jaeho Ko.

PETRONAS signed the engineering, procurement, construction, installation and commissioning contract for the project with the Technip and DSME consortium in June 2012.

The floating LNG facility will be located in Malaysia’s Kanowit gas field, 180 kilometres offshore Sarawak and will have the capacity to produce 1.2 mtpa of LNG per year.

Once operational, the facility is expected to change the landscape of the LNG business where the liquefaction, production and offloading processes of LNG, previously only possible at onshore plants are now able to be carried out hundreds of kilometres away from land and closer to offshore gas sources.

As such, the facility will also play a significant role in efforts to unlock the gas reserves in Malaysia’s remote and stranded fields currently deemed uneconomical to develop and evacuate.

[mappress] Petronas, June 25, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free