Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›First Subsea Mooring Connectors for LLOG Delta House FPS
Business & Finance

July 3, 2013 · about 13 years ago

First Subsea Mooring Connectors for LLOG Delta House FPS

Deepwater mooring specialist, First Subsea has been awarded a contract by LLOG Exploration to supply the subsea mooring connectors for the Delta House semi-submersible floating production system (FPS) in the Gulf of Mexico. The FPS will be located in Mississippi Canyon 254 in 4,500ft (1,373 m) water

1 minutes read
  • LinkedIn
  • X
  • Email

Deepwater mooring specialist, First Subsea has been awarded a contract by LLOG Exploration to supply the subsea mooring connectors for the Delta House semi-submersible floating production system (FPS) in the Gulf of Mexico. The FPS will be located in Mississippi Canyon 254 in 4,500ft (1,373 m) water, and accommodate production from a number of nearby fields, including LLOG’s previously announced discoveries in Mississippi Canyon 300 and Mississippi Canyon 431.

First Subsea is supplying 14 Ballgrab Type III, ball and taper, subsea mooring connectors (SMCs) with a corroded 1,733mT (16,992kN) MBL, which will be attached to polyester mooring lines. The SMCs’ mandrels will be manufactured and tested in compliance with DNV-0S-E302.

“We were looking for a subsea mooring connector that has been well proven in the Gulf of Mexico,” said Craig Mullett, Offshore Construction Manager, LLOG Exploration. “First Subsea’s Ballgrab connector has a solid reputation for ease of installation and reliability that made it the natural choice for the Delta House FPS mooring.”

The Delta House project will include an oil export line, a gas export line and a number of subsea systems. The export lines will connect the FPS to existing downstream pipeline infrastructure. The Delta House will have a production handling capacity of 100,000 bopd, 240 mmcfd, and 40,000 bwpd.

Press Release, July 03, 2013; Image: First Subsea

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

22 days ago

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

22 days ago
FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago