Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›JDR Cables Secures Submarine Cable Contract
Business & Finance

July 5, 2013 · about 13 years ago

JDR Cables Secures Submarine Cable Contract

In a recent tender procedure JDR Cables secured a £330,000 contract from Tidal Energy Limited (TEL) for the design, manufacture and delivery of a submarine cable connecting the DeltaStream unit to the shore. An initial 400KW full scale single turbine unit will be installed as part of the first phase

2 minutes read
  • LinkedIn
  • X
  • Email

In a recent tender procedure JDR Cables secured a £330,000 contract from Tidal Energy Limited (TEL) for the design, manufacture and delivery of a submarine cable connecting the DeltaStream unit to the shore.

An initial 400KW full scale single turbine unit will be installed as part of the first phase of development. Subsequent upgrades will be made to bring the DeltaStream up to full three turbine 1.2MW capacity as part of the DeltaStream development plan, however this scope of supply is purely to satisfy the requirements of the first prototype deployment.

The DeltaStream device shall have its own induction generator that will be connected to shore by a power cable. ‘Raw’ power from the generator at a nominal 450kVA, 3 phase, 6.6kv will be transmitted to the power conditioning plant located ashore at the point of connection to the local electrical distribution system.

No local power will be generated on the device to power auxiliary systems so all auxiliary power will also be supplied at 3 phase, 6.6kv within the submarine cable. The submarine cable will be laid directly on the seabed and will not be trenched.

In addition to the power conductors, at least one cable shall carry fibre optic links for control and monitoring signals, and an auxiliary power cable required to supply power for auxiliary power supplies on the DeltaStream device.

JDR Cables will supply either a single cable that has 6 cores (for the 2 sets of 3 phase 6.6kV) or 2 cables each with 3 cores (3phase/6.6kV), to be terminated at the device and at a shoreside termination box.

[mappress] Subsea World News Staff, July 5, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago