Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Christening of Jack-Up Drilling Rig Neptune at Astrakhan Yard (Russia)
Shipbuilding

July 8, 2013 · about 13 years ago

Christening of Jack-Up Drilling Rig Neptune at Astrakhan Yard (Russia)

A solemn christening ceremony for the jack-up drilling rig Neptune took place on 3 July 2013 at the Astrakhan Shipbuilding Production Association yard (enters Caspian Energy Group). The installation of the jack-up drilling rig Neptune was done at the Astrakhan Shipbuilding Production Association yar

2 minutes read
  • LinkedIn
  • X
  • Email

A solemn christening ceremony for the jack-up drilling rig Neptune took place on 3 July 2013 at the Astrakhan Shipbuilding Production Association yard (enters Caspian Energy Group).

The installation of the jack-up drilling rig Neptune was done at the Astrakhan Shipbuilding Production Association yard, and Caspian Energy Projects LLC effected the project management together with Lamprell Energy LTD.

The jack-up drilling rig Neptune of Letourneau 116E Class Platform was fabricated by the Lamprell Energy LTD yard in 2011 in Sharjah (UAE) for Eurasia Shelf drilling company. The construction was separated into 8 modules for their transportation by the Black Sea and channels system to Astrakhan where the final assembly of the rig took place. The operation of the rig Neptune will be done in the Caspian Sea at the water depth of 4.8 up to 105 meters. The living quarter of the platform will be equipped by air-conditioning system and provide the accommodation for the crew of 105 people.

Under the drilling rig construction project a unique engineering operation was made – skidding a cantilever (of the drilling facilities) on the platform. For the first time at the Astrakhan yards the drilling facilities complex of 1300 tons weight was transported by means of hydraulics.

The ceremony was attended by the Governor of the Astrakhan region Aleksandr Zhilkin, President of LUKOIL oil company Vagit Alekperov, Executive director of Eurasia Shelf drilling company Aleksandr Dzhaparidze and many other representatives of the Russian and foreign shipbuilding and oil and gas production companies. Tamara Sinyavskaya, a people’s artist of the USSR, a distinguished artist of RF became a “godmother” of the platform that is a traditional symbol at the commissioning of such facilities.

[mappress] Astrakhan Shipbuilding, July 8, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free