Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Storage›Germany: VSMC Completes Cable Installation at Meerwind Süd/Ost on Time
Storage

July 9, 2013 · about 13 years ago

Germany: VSMC Completes Cable Installation at Meerwind Süd/Ost on Time

Last weekend, VSMC installed the last cable for the Meerwind Süd/Ost wind farms by successfully accomplishing the final pull-in. A total of 3 load outs, 88 inter array cables and 176 pull-ins were completed on time. With safety and quality as a top priority, VSMC finished the challenging project wit

1 minutes read
  • LinkedIn
  • X
  • Email

Last weekend, VSMC installed the last cable for the Meerwind Süd/Ost wind farms by successfully accomplishing the final pull-in.

A total of 3 load outs, 88 inter array cables and 176 pull-ins were completed on time. With safety and quality as a top priority, VSMC finished the challenging project with no recordable incidents.

The offshore wind farms Meerwind Süd/Ost are a 288 MW project located in the German Bight in the North Sea, 23 km north of the island of Heligoland. The wind farm consists of 80 wind turbines with a power output of 3.6 MW each. The location is one of the most promising in the emerging offshore wind market in Germany. RWE Innogy recently contracted VSMC to lay and bury the infield cables for the Nordsee Ost offshore wind farm, also located in the German Bight.

[mappress]

Press release, July 9, 2013; Image: windmw

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Storage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Bernhard Schulte’s first LCO2 carrier step closer to Northern Lights
Business & Finance

Bernhard Schulte’s first LCO2 carrier step closer to Northern Lights

about 2 months ago

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago

EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Bernhard Schulte’s first LCO2 carrier step closer to Northern Lights
Business & Finance

Bernhard Schulte’s first LCO2 carrier step closer to Northern Lights

about 2 months ago
Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago
EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago