Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›LUKOIL Assembles Supporting Blocks for Caspian Sea Platform
Business & Finance

July 11, 2013 · about 13 years ago

LUKOIL Assembles Supporting Blocks for Caspian Sea Platform

LUKOIL has launched assembly of supporting blocks for the ice-resistant stationary platform located at Vladimir Filanovsky field in the Caspian Sea. The supporting blocks will be attached to the seabed by means of twenty piles, each with a diameter of more than 2 meters. The piles will be hammered i

2 minutes read
  • LinkedIn
  • X
  • Email

LUKOIL has launched assembly of supporting blocks for the ice-resistant stationary platform located at Vladimir Filanovsky field in the Caspian Sea.

The supporting blocks will be attached to the seabed by means of twenty piles, each with a diameter of more than 2 meters. The piles will be hammered into the seafloor up to 60 meters deep to ensures secure mounting of the platform, making it resistant against potential extreme ice and wave exposure. The water depth at the assembly point is 7 meters. The combined weight of the two supporting blocks is around 5,000 tons. Each supporting block is 28.3 m long, 23.7 m wide and 16.4 m tall.

The supporting blocks are assembled by means of the Transport and Installation Barge (TIB), which has a crane with a loading capacity of 400 tons. The loading capacity of the TIB is 13,450 tons, it is 140.3 m long and 62.3 m wide. The T-shaped barge comprises one main pontoon and two additional side pontoons (outriggers), which magnify the vessel’s loading capacity and stability when carrying super-heavy large-size cargoes.

This year, LUKOIL plans to install more supporting blocks – for the platform of the living-quarters module, for the central processing platform and for the riser block. In 2014, topside sections will be mounted on the supporting blocks. All of the offshore facilities are manufactured by Astrakhan’s shipbuilding enterprises to orders from LUKOIL.

Commercial drilling at Vladimir Filanovsky field is scheduled to begin in 2014. Oil production is to begin by the end of 2015.

[mappress]

Press Release, July 11, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago