Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Storage›Germany: Second Phase of Global Tech I Internal Cabling Starts
Storage

July 19, 2013 · about 13 years ago

Germany: Second Phase of Global Tech I Internal Cabling Starts

The second cable installation phase at the Global Tech I offshore wind farm has started. The first cables have already been laid between the foundations and pulled into them, and now it is time for them to be flushed into the ocean floor by the installation vessel Cable Innovator and its Remotely Op

1 minutes read
  • LinkedIn
  • X
  • Email

The second cable installation phase at the Global Tech I offshore wind farm has started.

The first cables have already been laid between the foundations and pulled into them, and now it is time for them to be flushed into the ocean floor by the installation vessel Cable Innovator and its Remotely Operated Vehicle (ROV) Excalibur.

The ROV is driven by chains and incorporates two sets of jetting swords, placed left and right along the corresponding cable. The sword jetting system in combination with hundreds of nozzles, pump out the water with high pressure at the same time as they are driving through the seabed.

As a result, the soil on the cable route is liquefied and dissolved so the cable sinks into the seabed. Subsequently, the ROV travels again along the cable route and measures how deep the submarine cable has sunk.

The high-capacity submarine cables will be flushed into a soil depth of approximately 1.40 meters and protected from damaging.

Around 120 kilometers of submarine power cables will connect the 80 wind turbines to the Global Tech I transformer station in seven ring circuits.

[mappress]

Offshore WIND Staff, July 19, 2013; Image: Prysmian PowerLink Services

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Storage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago

EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago
EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago