Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›Germany: Second Phase of Global Tech I Internal Cabling Starts
Wind Farms

July 19, 2013 · about 13 years ago

Germany: Second Phase of Global Tech I Internal Cabling Starts

The second cable installation phase at the Global Tech I offshore wind farm has started. The first cables have already been laid between the foundations and pulled into them, and now it is time for them to be flushed into the ocean floor by the installation vessel Cable Innovator and its Remotely Op

1 minutes read
  • LinkedIn
  • X
  • Email

The second cable installation phase at the Global Tech I offshore wind farm has started.

The first cables have already been laid between the foundations and pulled into them, and now it is time for them to be flushed into the ocean floor by the installation vessel Cable Innovator and its Remotely Operated Vehicle (ROV) Excalibur.

The ROV is driven by chains and incorporates two sets of jetting swords, placed left and right along the corresponding cable. The sword jetting system in combination with hundreds of nozzles, pump out the water with high pressure at the same time as they are driving through the seabed.

As a result, the soil on the cable route is liquefied and dissolved so the cable sinks into the seabed. Subsequently, the ROV travels again along the cable route and measures how deep the submarine cable has sunk.

The high-capacity submarine cables will be flushed into a soil depth of approximately 1.40 meters and protected from damaging.

Around 120 kilometers of submarine power cables will connect the 80 wind turbines to the Global Tech I transformer station in seven ring circuits.

[mappress]

Offshore WIND Staff, July 19, 2013; Image: Prysmian PowerLink Services

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsStorage

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free