Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Norfolk Shipyard Gears Up to Repair USS Wasp
Shipbuilding

July 30, 2013 · about 13 years ago

Norfolk Shipyard Gears Up to Repair USS Wasp

The Norfolk Shipyard is gearing up to repair the US Navy’s amphibious assault ship USS Wasp (LHD 1) having secured a contract modification for the vessel’s planned maintenance availability. “We’re thrilled to welcome the U.S. Navy’s amphibious assault ship, USS Wasp (LHD 1), to our Norfolk, VA shipy

1 minutes read
  • LinkedIn
  • X
  • Email

The Norfolk Shipyard is gearing up to repair the US Navy’s amphibious assault ship USS Wasp (LHD 1) having secured a contract modification for the vessel’s planned maintenance availability.

“ We’re thrilled to welcome the U.S. Navy’s amphibious assault ship, USS Wasp (LHD 1), to our Norfolk, VA shipyard where our team will execute a $110 million contract to perform maintenance and modernization to the vessel, ” BAE Systems said in a release.

The contract modification secures a fiscal 2013 drydocking planned maintenance availability, which includes the planning and execution of depot-level maintenance, alterations, and modifications that will update and improve the ship’s military and technical capabilities.

Accommodating aircraft and amphibious vehicles, the USS Wasp was the Navy’s vessel of choice in responding to Hurricane Irene in 2011 as well as Super Storm Sandy in 2012, offering emergency communications assistance, air traffic control capabilities, and carrying aircraft and equipment. The U.S. Navy also relies on USS Wasp as the test platform for Joint Strike Fighters.

The work will be performed in Norfolk, Virginia and is expected to be completed by May 2014.

[mappress] Norfolk Shipyard, July 30, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free