Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Uljanik Shipyard Secures Multipurpose Vessel Order from Jan De Nul
Shipbuilding

August 14, 2013 · about 13 years ago

Uljanik Shipyard Secures Multipurpose Vessel Order from Jan De Nul

Last week, Jan De Nul Group ordered a new vessel at the Uljanik Shipyard in Pula, Croatia. The vessel with a deadweight of 10,500 tonnes and a total length of 138 m will be a multipurpose vessel. It will be a trenching and offshore support vessel, a subsea rock installation vessel and a cable laying

1 minutes read
  • LinkedIn
  • X
  • Email

Last week, Jan De Nul Group ordered a new vessel at the Uljanik Shipyard in Pula, Croatia.

The vessel with a deadweight of 10,500 tonnes and a total length of 138 m will be a multipurpose vessel. It will be a trenching and offshore support vessel, a subsea rock installation vessel and a cable laying vessel.

In the cable laying mode, the vessel will be able to install up to 10,000 tonnes of cable and will thereto be equipped with a 5,500 tonnes capacity turntable above deck and a 4,500 tonnes capacity turntable below deck along with tensioners as required by the project, chute and auxiliary equipment.

In the subsea rock installation mode, the vessel will be able to install up to 10,000 tonnes of rock in a single load by using the aft stone hopper with a capacity of 3,000 tonnes and the midship hopper with a capacity of 7,000 tonnes along with the two excavators and the fall pipe for accurate rock installation at up to 200m water depth.

In the combination mode any combination of the above will be possible up to the carrying capacity of the vessel.

The vessel will be delivered in 2015 and will be the 76th vessel in the fleet of Jan De Nul Group.

[mappress]

Jan De Nul Group, August 14, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free