Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›USA: NNS Installs Third Elevator on Aircraft Carrier Gerald R. Ford
Shipbuilding

August 16, 2013 · about 13 years ago

USA: NNS Installs Third Elevator on Aircraft Carrier Gerald R. Ford

Huntington Ingalls Industries announced yesterday that its Newport News Shipbuilding (NNS) division installed the third and final aircraft elevator on the nuclear-powered aircraft carrier Gerald R. Ford (CVN 78). The elevator, which is used to move aircraft from the hangar bay to the flight deck qui

1 minutes read
  • LinkedIn
  • X
  • Email

Huntington Ingalls Industries announced yesterday that its Newport News Shipbuilding (NNS) division installed the third and final aircraft elevator on the nuclear-powered aircraft carrier Gerald R. Ford (CVN 78).

The elevator, which is used to move aircraft from the hangar bay to the flight deck quickly and safely, is located on the starboard side of the ship. It measures 85 feet long and 52 feet wide and weighs 120 tons, akin to a steam locomotive.

“The Ford class is designed with three aircraft elevators, one less than the Nimitz class,” said Rolf Bartschi, NNS vice president , CVN 78 carrier construction. “The design provides greater flight deck area for increased sortie rates over the Nimitz-class design. The location and number of aircraft elevators are an integral part of the design.”

Gerald R. Ford’s primary hull structure reached 100 percent structural completion in May, bringing more than three years of structural erection work to a close. Work continues on the ship, including work on the piping and electrical systems and habitability areas such as the galley and mess spaces. Shipbuilders are also in the process of painting the hull prior to the ship’s christening, scheduled for Nov. 9.

[mappress]

HII, August 16, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free