Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Additional Work on P-63 Platform-Vessel Completed
Shipbuilding

August 26, 2013 · about 13 years ago

Additional Work on P-63 Platform-Vessel Completed

The P-63 platform-vessel ended being temporarily located in Ilha de Santana, in Macaé (RJ) on Friday (August 23), after being finished, strictly within the set period, additional works resulting from a change in the underwater layout of the wells was carried out to adhere to environmental licensing

1 minutes read
  • LinkedIn
  • X
  • Email

The P-63 platform-vessel ended being temporarily located in Ilha de Santana, in Macaé (RJ) on Friday (August 23), after being finished, strictly within the set period, additional works resulting from a change in the underwater layout of the wells was carried out to adhere to environmental licensing conditions.

The P-63, which is scheduled to start production on October 23, is among the new units coming on stream in 2013, contributing to an increase in the Company’s oil production as well as reaching production targets forecast in the 2013-2017 Business and Management Plan.

With a capacity to process 140,000 barrels/day of oil and compress one million m3/day of gas, the unit continues on its journey, with the help of tugs, to its final destination in the Papa-Terra field in the post-salt Campos Basin, operated by Petrobras (62.5%) in partnership with Chevron (37.5%).

The P-63 was converted into an FPSO (Floating Production, Storage and Offloading) from the tanker BW Nisa at the Cosco Shipyard in China, with the latter stages of construction carried out at the QUIP/Honorio Bicalho construction site in Rio Grande (RS). The services were carried out by the Quip consortium (Queiroz Galvão, UTC, Iesa and Camargo Correa) and BW Offshore and employed about 1,500 workers at peak construction.

[mappress]

Petrobras, August 26, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free