Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Otto Energy Continues Drilling Ops on Galoc Development, Philippines
Business & Finance

August 28, 2013 · about 13 years ago

Otto Energy Continues Drilling Ops on Galoc Development, Philippines

Otto Energy Limited, as operator of the producing Galoc oilfield joint venture offshore the Philippines, provides the following update on the Galoc-5H and Galoc-6H drilling campaign in SC14C, part of the Galoc Phase II development approved in 2012. During the period from 0600 hours (AWST) on 21 Augu

2 minutes read
  • LinkedIn
  • X
  • Email

Otto Energy Limited, as operator of the producing Galoc oilfield joint venture offshore the Philippines, provides the following update on the Galoc-5H and Galoc-6H drilling campaign in SC14C, part of the Galoc Phase II development approved in 2012.

During the period from 0600 hours (AWST) on 21 August 2013 to 0600 hours (AWST) on 28 August 2013, completed suspension activities on the G-6H well prior to moving the Ocean Patriot rig to the G-5H well and commencing preparation to drill the 8 ” hole horizontally for approximately 2,400 metres through the reservoir interval prior to running the completion liner and assembly.

The forward plan is to continue drilling the G-5H well 8 ” hole horizontally for approximately 2,400 metres through the reservoir interval and run the completion liner and assembly.

Location and Proposed Depth The Galoc field is located in Service Contract SC14C (Galoc Sub Block) in 290metres of water approximately 65km North West of Palawan Island and 350km south of Manila in the Republic of the Philippines. The Galoc-5Hand Galoc-6Hdevelopment wells are being drilled within the existing producing field that has delivered over 10 MMbbls of production since the field was commissioned in 2008.

After drilling of both Galoc-5Hand Galoc-6His completed, the DOF operated Skandi Hercules construction vessel will be used to install the subsea equipment and complete the hook-up of both wells to the FPSO Rubicon Intrepid. First oil from the Phase II wells is expected in November 2013

[mappress]

Press Release, August 28, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago